Humboldt Park Residence

Chicago, IL
To Be Completed in 2023
1,600 SF

This historic Chicago greystone, originally built in 1895, is undergoing a major interior renovation with minor updates to the exterior facade. A new kitchen will expand to twice its original size, featuring custom cabinetry, a breakfast nook, and a glass-and-steel partition wall along the adjoining office.

A new backyard deck with trellised lighting will create an intimate outdoor space, and a corrugated steel garage will enclose the backyard garden and fire pit area.

The second floor will feature a new master bathroom with terrazzo tile and custom millwork. Renovations to the master closet, second bedroom, and other bathrooms are also underway.

 
Previous
Previous

California College of the Arts

Next
Next

Lincoln Park Bath